top of page

Manufacturing Area Relocation

Ozroll slide-track manufacturing area relocation in progress.

We began in March 2020 with the relocation of an existing Industrial Electrical Switchboard which was no longer in use to the new Slide Track Manufacturing and Assembly area,

which consisted of relocating the sub-mains and fitting new cable tray and supports.


Later that month our team returned to install all new 3 phase power circuits for the fabric RF and Impulse welders, as well as single phase power points and sockets for pendant outlets ready for the relocation at end of April/ early May.


Our team installed all new LED high-bay lighting throughout the new manufacturing and assembly areas to replace the existing insufficient lighting.



Comments


bottom of page